Product Overview
The Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana is a Outdoor Curtains product. It features tab top & bottom: constructed with detachable tab top, which.
Key Features
- Tab Top & Bottom: Constructed with detachable tab top, which makes the curtains to be moved around and hung with ease. The bottom tabs make the curtain fixed enough that it won't be blown by the wind. It provides protection against rain, snow, heavy wind and other harsh weather element.
- Multiple Options: Come in a range of colors and sizes to match the decoration of your outdoor space. Each package includes 2 panels of outdoor curtains, each measures width 110 inch by length 84 inch.
- High Quality Material: 100% polyester fabric with waterproof processing technology, is also able to block out sunlight and UV ray. It is efficient in noise reducing, insulating against heat.
- Widely Used: Perfect for both indoor and outdoor spaces. These outdoor curtains provide great privacy and safety for your porch, pool, balcony, gazebo, patio pergola, garden, bathroom or indoor rooms.
- Easy to Care: The curtains are machine washable in cold water, please do not bleach, tumble dry and iron at low temperature.
Why Choose the Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana
The Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana offers tab top & bottom: constructed with detachable tab and multiple options: come in a range of colors. These features make the Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana a strong option in the Outdoor Curtains category.
Best For
The Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana is best suited for: both indoor and outdoor spaces.
Quick Summary
The Easy-Going Outdoor Patio Curtains Detachable Tab Top Windproof Weatherproof Curtain for Cabana is a Outdoor Curtains product by Easy-Going. Brand: Easy-Going. Color: Teal. Material: Polyester. Product Dimensions: 84"L x 110"W. Opacity: 85. Price: $82.48.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Easy-Going |
| Color | Teal |
| Material | Polyester |
| Product Dimensions | 84"L x 110"W |
| Opacity | 85 |